
Case study“Thanks to Noda and Berkeley Lab, we now have a solution that delivers both efficiency and demand flexibility. Their technology helps us save energy and costs every day, while maintaining high-quality indoor conditions and supporting grid reliability.”
- 40%
- Load shed during a grid emergency, with zone temperatures inside site limits
- $60K
- In savings at two sites within six months
- 4M
- Sq feet across 3 Macerich pilot sites
Source: Lawrence Berkeley National Laboratory case study, 2025